-
The 40' x 8' green wall. Both grow lights and LED lights illuminate this wall from top and bottom.
-
The temperature controlled greenhouse for staging and fabricating all containers 50 miles off site prior to delivery to the Daimler building.
-
Getting ready to load all the containers labeled with their precise location on to the truck. We made sure to load so those containers on the highest floor of the building came off first, working our way down from there.
-
Main floor lobby atrium showing one of the large doors that open to the outside.
-
The food and dining concourse showing the high gloss terrazo floor that had to be so carefully protected during installation.
-
A view from the mezzanine above showing more of the custom built aluminum containers.
-
A view of both the dining concourse and mezzanine with a variety of the custom built aluminum containers.
-
Example #1 of the modern design and configuration of the clean employee centric office environment consistent throughout the remaining 7 floors of office space.
-
Example #2 of a different configuration.
-
Example #3 of a different configuration.
-
Example #4 of a different configuration.
-
Container color and texture were chosen to compliment the building's use of other construction materials like carpeting and alluminum wall paneling.
-
A view from one of the roof top patios surrounded by a living roof deck and a compliment of exterior containers and plants part of this same project.
-
The green wall adjacent the main floor lobby coffe bar and seating area.